(702)688-5665 email@BlackCanyonNV.com

City of Las Vegas Downtown Civic Center Building & Plaza

Black Canyon Construction did the landscaping consisting of 108” box trees, shrubs, irrigation, raised planters on the 2nd and 6th level of the building with light weight soil cells underneath, a sod field, and a clock system mounted to the wall inside the building for the 190 million dollar development encompassing  the entire city block in the block bordered by Main Street, Clark, First street and Bonneville.

Copyright © 2023 Black Canyon Construction   |  All rights reserved.  |  Privacy Policy